Stockrabit · Analysts
Questions across 5 calls

Rupesh Sankhe

Firm not listed in source transcripts

NHPC Limited

NHPC Limited CC-Sep23.pdf · 2023-11-08
Yes. Sir, couple of questions from my side. Firstly, in the last two quarters, our incentive income is almost nil. So, how do we see the incentive incomes in the coming quarters? Because we do see that availability factor will be lower than the last 2Q FY23. That was the first question. And secondly, sir, now we have a huge pipeline on the renewable energy side, as well as the hydro projects, pump hydro storage. So, how do we see the equity contribution? Are we comfortable position to have for equity contribution? Or we need to have some equity dilution going right?
Yes, sir. On the capex side? Yes.

Acme Solar Holdings Limited

SJVN Limited

SJVN Limited CC-Sep23.pdf · 2023-11-09
Yes, sir. A couple of questions, sir. Firstly, we are expecting our capacity to increase from 2000 megawatt to 12,000 megawatt in the next two to three years. So what will be the equity once we get the 12,000 megawatt capacity in operation? That is the first question. And second question is, sir, what is the status of Arun-3 and Buxar? Are they on a track to on the track?
Yes. So on the roadstock account, point number seven, you have mentioned three projects which are under construction, Luhri, Sidney and the Dolasin. There is some mutual agreed implementation is pending. So can you throw some light on that and tell me what is that?